Opportunity and feasibility
We identify where generation makes sense and what return you can expect before investing.

We turn roofs and land into your own energy and new revenue. We develop solar parks of up to 5 MW and industrial self-consumption projects, from the first idea to ready-to-build, keeping risk under control at every stage.

We take care of every part of development so the project reaches Ready to Build on solid ground.

We identify where generation makes sense and what return you can expect before investing.
An installation designed around your consumption and your site, making the most of every metre.
We guide you through the whole grid access and connection process with the network operator.
We organise planning and environmental permitting so the timeline keeps moving.
We find the structure and funding routes that make the project viable.
A mature, fully documented project, ready to build, finance or sell.
Ready to BuildWe develop distributed generation parks of up to 5 MW, designed around the model that creates most value for each site and each client.
Parks connected to the distribution grid that sell power on the market or to a buyer under a long-term PPA.
Large-scale self-consumption: parks on nearby land or within the industrial estate that cover the demand roofs cannot meet.
We develop distributed generation parks from feasibility to operation, and design battery systems that make them more flexible. This is a sample of our portfolio, project by project.
| Solar park | Location | Power | State |
|---|---|---|---|
| Domains 2 | Saint James of Domenys | 5.59 MWp | In process |
| Riudarenes Serra Magre | Riudarenes | 5.53 MWp | RTB - Ready to build |
| Maià de Montcal | Maià de Montcal | 4.89 MWp | Waiting |
| Caldes de Malavella | Caldes de Malavella | 4.76 MWp | In process |
| Argelaguer | Argelaguer | 4.74 MWp | RTB - Ready to build |
| Fogars de la Selva | Fogars de la Selva | 4.58 MWp | Waiting |
| Cassà de la Selva With batteries: 3.6 MW / 16.9 MWh | Cassà de la Selva | 3.57 MWp | In process |
| Garrigoles | Garrigoles | 3.49 MWp | In process |
| El Vendrell | El Vendrell | 3.18 MWp | Waiting |
| Martorell | Martorell | 3.04 MWp | In process |
| Sant Fruitós de Bages | Sant Fruitós de Bages | 2.93 MWp | In operation |
| Sol de la Selva With batteries: 2.77 MW / 11.3 MWh | Caldes de Malavella | 2.88 MWp | In process |
| Riba-roja d'Ebre | Riba-roja d'Ebre | 2.70 MWp | RTB - Ready to build |
| Corbera d'Ebre | Corbera d'Ebre | 2.46 MWp | RTB - Ready to build |
| Gavà La Sentiu | Gava | 2.13 MWp | In process |
Approximate location by municipality. Data from November 2026.
Map: approximate location by municipality; the size of the point is proportional to the power.
of solar parks developed and in development: in operation, ready to build, in permitting or on hold.
of battery storage designed, under construction or already in operation, in hybrid projects and at customer facilities.
Any free space can generate energy and new income. Tell us where it is and how big it is, and we will assess its potential.

Solar parks and distributed generation.
Self-consumption in industrial buildings, offices and facilities.
Solar awnings and charging points.
Outdoor spaces that provide shade and energy.
Any free space can generate energy and new income. Tell us where it is and how big it is, and we will assess its potential.

Your own energy on your roof or plot, matched to how and when you consume.

One installation shared between neighbours, to invest with more scale.

Connected to the distribution grid, selling power on the market or under a long-term PPA.
Energy generated close to where it is used.
Large warehouses, logistics centres and cold chains are the loads that will grow most with electrification. A nearby park gives them stable energy for years to come.
Talk to an expert